Your project in five steps

From the plot to the building permit, your project is divided into five steps. After each step you decide how to proceed. For each step, the purpose, scope of services, your contribution, the duration and the remaining limitations are set out below.

1
Quick Check
€500, credited if the full design is commissioned
2
Feasibility study
30 % of the fixed price, credited
3
Preliminary decision application
€1,500, if needed
4
Design, phases 1 to 4
Fixed price
5
Permit application and authority
in the fixed price

All prices include VAT. Authority fees are additional.

1. Buildability Quick Check

€500 incl. VAT, credited if the full design is commissioned

For the time before buying a plot or right at the start: you want to know whether your dream house appears fundamentally conceivable on the plot before you spend more money.

What you receive

  • Written initial assessment based on the records
  • Short calculation of GRZ and GFZ, stating whether the desired living area appears fundamentally achievable
  • List of the sources evaluated: geoportal, development plan, land-use plan
  • On request: extracts from the register of building-law obligations (Baulastenverzeichnis) and from the contaminated sites register, €150 each plus the authority's fee

What we need from you

  • Address of the plot, cadastral district (Gemarkung), Flur and parcel number (Flurstück)
  • House type and desired living area
  • Existing documents, for example a sales brochure or site plan
  • For enquiries with authorities: power of attorney and proof of ownership or purchase contract

Duration

At most one week after receipt of payment and of the information. We pass on extracts from authorities as soon as they are available.

Limitations and next steps

The Quick Check is a professional initial assessment and not an assurance that the plot can be built on. It does not include a site visit, a drawing of the building or a construction cost estimate. Building-law obligations (Baulasten), contamination, unexploded ordnance, site servicing as well as unpublished statutes and development freezes cannot be conclusively clarified from public sources.

The price of the Quick Check is credited in full against the feasibility study.

2. Feasibility study

30 % of the fixed price, credited if the full design is commissioned

The step before the design: we show what appears specifically possible on your plot, where the house can stand and what cost range you should expect.

What you receive

  • Outline of the house on the plot as a building footprint sketch
  • Calculation of GRZ and GFZ
  • Living area calculation
  • Construction cost estimate as a non-binding cost range
  • Summary of unresolved issues, assumptions and limitations
  • Written result with a recommendation on how to proceed

What we need from you

  • Address, cadastral district (Gemarkung), Flur and parcel number (Flurstück)
  • Completed specification questionnaire
  • Existing documents on the plot
  • For enquiries with authorities: power of attorney and proof of ownership or purchase contract

Duration

Usually 2 weeks after receipt of payment and of all documents. This is a typical value, not a fixed deadline.

Limitations and next steps

The feasibility study, too, is an assessment based on the records. Only the authority decides with binding effect. The list of limitations expressly names what remains open: building-law obligations (Baulasten), contamination, unexploded ordnance, site servicing, unpublished statutes and development freezes. The cost range is based on average benchmark values and is not a cost ceiling.

Fair arrangement: if the study shows that the plot fundamentally cannot be built on, for example because it lies outside built-up areas, we charge only the Quick Check price of €500.

If you commission the design within three months, we credit the feasibility study in full against the fixed price.

3. Application for a preliminary planning decision (Bauvoranfrage)

€1,500 incl. VAT, plus fees

Not always necessary. Useful if a planning law question remains open after the feasibility study, for example whether the house fits in with its surroundings or how many storeys are permitted. The authority answers the questions asked with binding effect in a preliminary planning decision (Bauvorbescheid).

What you receive

  • Preparation of a list of questions for the building authority, agreed with you
  • Application for a preliminary planning decision with application form
  • Site plan based on the cadastral map
  • Drawings of the project to the extent required
  • Building specification
  • Answering the authority's queries and forwarding the decision

What we need from you

  • Power of attorney and proof of ownership or purchase contract
  • If you are not yet the owner: the owner's consent, where the authority requires it

Duration

The authority determines the processing time. It typically takes around three months from receipt of a complete application.

Limitations and next steps

We owe professional preparation and submission, we cannot promise a positive preliminary planning decision. The preliminary planning decision answers only the questions asked and does not replace a building permit. You bear the authority's fees and the costs of official documents.

The application for a preliminary planning decision is a separate service and is not credited against other services.

4. Design, service phases 1 to 4

Fixed price as per offer

From the first conversation to the building permit application ready for submission. The fixed price is based on the construction costs, which result from living area and specification, and is set out in writing before we start.

Service phase 1
Project briefing
Together we clarify the brief: schedule of rooms, living area, specification and the constraints of the plot. Result: an agreed schedule of rooms.
Service phase 2
Preliminary design
First floor plans and the position of the house on the plot. Result: a preliminary design that we discuss with you.
Service phase 3
Developed design
Worked-out floor plans, elevations and sections. The two rounds of revisions take place here. Result: the design approved by you.
Service phase 4
Permit application design
The drawings and documents for the application. Result: the building permit application ready for submission.

What you receive

  • Dimensioned floor plans of all storeys
  • All elevations and sections
  • Site plan with setback areas
  • Calculation of living area, GRZ and GFZ
  • Building specification
  • The complete application forms
  • Technical coordination, checking and incorporation of the specialist firms' contributions
  • Compilation of the building permit application documents
  • Design and two rounds of revisions to your floor plan

What we need from you

  • Your wishes for the schedule of rooms and the specification questionnaire
  • Your approval of the floor plan
  • The documents from the specialist firms: surveying, ground investigation, structural engineering, energy compliance documentation and, depending on the federal state, fire safety

Duration

We prepare the technical drawings (floor plans, elevations, sections) and the application forms usually within 2 weeks once the questionnaire and schedule of rooms have been worked out. The building permit application is submitted as soon as all documents are complete.

Limitations and next steps

Revision rounds: the fixed price includes the design and two revision rounds. A round comprises the change requests you send us bundled together and their agreed processing. Each further round is charged at 15 % of the agreed basic design fee. The sole basis is the fixed price for service phases 1 to 4 including VAT, excluding the Specialist Consultant Service, visualisations, third-party costs and other extras.

The additional fee applies only to services that become additionally or repeatedly necessary because of changed wishes on your part. Corrections of our own errors, design services owed in any case and additional requirements from the authority concerning our application documents do not trigger an additional fee. Before starting any chargeable additional work, we inform you of the scope, the specific amount in euros and the effect on the schedule. We start only once you have confirmed this in text form, for example by email.

Not in the fixed price: the services of the specialist firms, which invoice you directly, the authorities' fees as well as utility connections and supply. With the Specialist Consultant Service for €2,500 we support you organisationally: we research suitable specialist firms, obtain quotes, pass on the contacts and, after your cost approval and power of attorney, handle the commissioning in your name.

If you later choose a larger living area or a higher specification, we recalculate the fixed price using the same method.

5. Permit application and authority

included in the fixed design fee

We submit the application and support the procedure through to the building permit as your point of contact with the building authority.

What you receive

  • Submission of the building permit application to the responsible building authority
  • Answering the authority's queries
  • Dealing with additional requirements concerning our application documents, at no extra cost
  • Forwarding additional requirements concerning specialist documents to the specialist firms
  • Forwarding the decision to you

What we need from you

  • Your signatures on the application documents
  • The authority's fees, which it charges you directly
  • A short reply if the authority needs information from you

Duration

The authority determines the duration of the procedure. It typically takes around six months from receipt of a complete application.

Limitations and next steps

Only the authority decides on the building permit application, we cannot promise a permit. Queries and additional requirements from the authority do not change the fixed price. Redesigns that go back to new wishes on your part are not included and count as a further revision round.

After the permit you use the drawings to obtain initial quotes from construction companies. We do not offer construction drawings, tendering or site management.

From enquiry to commission

Your enquiry via this website is free of charge and non-binding. Sending it does not create a paid order. You commission paid services in a separate step.

  1. You receive an offer from us with a clearly defined scope of services and total price.
  2. Together with the offer you receive the consumer information, the notice of the right of withdrawal and the model withdrawal form.
  3. After you have commissioned us, we send you the contract confirmation and all documents by e-mail as PDF files.
  4. If you want us to start work before the withdrawal period has expired, you declare this separately and expressly.

Your next step

With the calculator you see in three steps what your design is likely to cost. The enquiry is free of charge and non-binding.

Calculate fixed price Non-binding enquiry